Floor Remodeling: Day 9 (Laminate flooring is down!)

By , December 15, 2010 3:27 pm

Yes! We finally completed the main area! We aren’t complete with the project as a whole as we still need to finish up with quarter round in some areas, put furniture back and finish up the steps. However, the challenging parts are done!

FrontView 

BackView

I may do another post or two regarding this project when we are “done” but our experiences thus far should (hopefully) provide some helpful insights to those contemplating any RV flooring remodeling project.

On Day 9 we did the following:

  • completed laying down laminate
  • added additional nails to the trim piece under the slide out steel plate
  • sunk the nails down (and remove screws)
  • made two trips to the hardware store

Here is a rough break down of our costs:

image

 

image

Be Sociable, Share!

4 Responses to “Floor Remodeling: Day 9 (Laminate flooring is down!)”

  1. Barb says:

    Whew! Gorgeous! But, so much work! Bravo!!!

  2. Dasy says:

    Yes, it was a lot of work for us. We have seen it down in much less time by those in the know/professional. We had never done laminate or wood flooring before. We should be faster next time! 🙂

  3. Brent says:

    Looks great! Always does take longer to do it yourselves and I sometimes hate it mid project but can’t beat the feeling of pride and accomplishment when you are done. Nice work!

  4. Rob says:

    Your accelerator looks disturbingly like my first MicroTac.

    SFW http://tinyurl.com/2e8xmyw